Loading the speeder flat with lumber for the Chama River bridge walkway.
Richard Dick, Margrethe Feldman and Karen Stover ride the speeder to the bridge site.
Tuesday's train departs Chama
The machine shop/engine house doors
Bob Ross and Terry Woolsey load a new sign for the south end of Osier.
Caboose 05635
Description: The side sills have been installed and epoxied on caboose 05635--or should that be "former" caboose 05635?
The side sills have been installed and epoxied on caboose 05635--or should that be "former" caboose 05635?The side sills have been installed and epoxied on caboose 05635--or should that be "former" caboose 05635?
Tim Bristow uses a 90 degree chisel to cut mortises in an end sill for caboose 05635
Don Bayer takes measurements in preparation for cutting the needle beam on caboose 05635