Tim Bristow, Les Calark, John Sutkus and Don Bayer lay rail inside the CRF.
2006 Work Session S_19
Description:
Les Clark, John Sutkus and Tim Bristow re-align rail to straighten track while Marty Gonzales drills holes in foundation to secure rebar reinforcement.
2006 Work Session S_20
Description:
John Sutkus, Russ Hanscom, Ray Diffee, Don Bayer, Ed Lowrance and Les Clark drive spikes to secure CRF inside track.
2006 Work Session S_21
Description:
Don Bayer drives spike as Ed and Russ assist while Les and John observe.
2006 Work Session S_22
Description:
Russ Hansom uses his Kubota tractor to ballast track with gravel.
2006 Work Session S_23
Description:
Tim, Don and Les cut a piece of rail to size with metal cutting chop saw.
2006 Work Session S_24
Description:
Ed, Les, Don, John , Tim and Marty carry rail to lay in place on existing ties.