FIDO
HOME
ABOUT US
Mission History Directors Committees Documents Contacts RAILROAD
Train Rides C & TS Commission
C&TS Railroad Governing Documents
Rolling Stock Maps QR
JOIN / RENEW / GIVE
Join or Renew Now! Preserving Narrow Gauge Past for the Future (PNGPF)
PNGPF PLEDGES & DONATIONSRailway Post Office Car 54 Cook Car 053 Gramps Frameless Tank Car Tourist Sleeper 470 Enhanced Interpretation
Master Interpretive Plan
Car Shelter Passenger Trucks
Past Campaigns
ACNGS II Update Summer 2012 Progress Report Summer 2011 Missions Accomplished with ACNGS and ACNGS II Another Century of Narrow Gauge Steam II
Make a Donation Planned Giving ENGINE 463
Follow the Progress Engine 463 Events
VOLUNTEER
FIDO Link Volunteer Restoration Session Description Volunteer Forms and Information Docent Program Colorado Springs
COLLECTIONS
Dorman Collection Robart Collection Payne Collection Gildersleeve Collection Berkstresser Collection Sperry Collection Lowrance Collection Spence Collection Photo Downloads Photo Catalogs Library
NEWS
Archives
STORE / CHARTERS
GALLERIES
Gallery Sound Gallery
CALENDAR

Session A (May 9-13)
Sort by
Start Cooliris!
The electrical crew takes a breather from a hectic week to pose for a crew portrait.
  • The electrical crew takes a breather from a hectic week to pose for a crew portrait.
  • Description: The electrical crew takes a breather from a hectic week to pose for a crew portrait. Left to right: John Engs (team leader), John Cole, Russ Hanscom, Noreen Breeding, Mark Valerius, Marshall Smith, and Roger Breeding seated in front with Jeb.
John Cole and John Sutkis
  • John Cole and John Sutkis
  • Description: John Cole and John Sutkis, concrete team leader, discuss the excavation work for the concrete on the first day of Session A.
John Cole, John Sutkis and some of the donated conduit for the electrical project.
  • John Cole, John Sutkis and some of the donated conduit for the electrical project.
  • Description: John Cole, John Sutkis and some of the donated conduit for the electrical project. John brought the compressor all the way from the Orange Empire Railway Museum in California in his wife’s Ford Explorer.
Prep work for the electrical and concrete work is under way.
  • Prep work for the electrical and concrete work is under way.
  • Description: Prep work for the electrical and concrete work is under way. L-R: John Engs, Chuck Armstrong, Ted Smith and Martin Gonzalez.
CRF lead partially completed.
  • CRF lead partially completed.
  • Description: Max Pacheco’s track gang has the second switch to connect the Antonito RIP track to the CRF lead partially completed.
Roger Breeding and Jeb, the chief electrical inspector.
  • Roger Breeding and Jeb, the chief electrical inspector.
Marshall Smith and John Engs, electrical team leader
  • Marshall Smith and John Engs, electrical team leader
  • Description: Marshall Smith and John Engs, electrical team leader, install one-inch and two-inch EMT conduit on the north wall.
Martin Gonzalez, Chuck Armstrong, John Sutkus and Fred Kuhns
  • Martin Gonzalez, Chuck Armstrong, John Sutkus and Fred Kuhns
  • Description: Concrete crew members Martin Gonzalez, Chuck Armstrong, John Sutkus and Fred Kuhns get the rebar ready for Wednesday’s pour.
Ed Lowrance, CRF project manager, getting all tied up in his work with the rebar.
  • Ed Lowrance, CRF project manager, getting all tied up in his work with the rebar.
 