FIDO
HOME
ABOUT US
Mission History Directors Committees Documents Contacts RAILROAD
Train Rides C & TS Commission
C&TS Railroad Governing Documents
Rolling Stock Maps QR
JOIN / RENEW / GIVE
Join or Renew Now! Preserving Narrow Gauge Past for the Future (PNGPF)
PNGPF PLEDGES & DONATIONSRailway Post Office Car 54 Cook Car 053 Gramps Frameless Tank Car Tourist Sleeper 470 Enhanced Interpretation
Master Interpretive Plan
Car Shelter Passenger Trucks
Past Campaigns
ACNGS II Update Summer 2012 Progress Report Summer 2011 Missions Accomplished with ACNGS and ACNGS II Another Century of Narrow Gauge Steam II
Make a Donation Planned Giving ENGINE 463
Follow the Progress Engine 463 Events
VOLUNTEER
FIDO Link Volunteer Restoration Session Description Volunteer Forms and Information Docent Program Colorado Springs
COLLECTIONS
Dorman Collection Robart Collection Payne Collection Gildersleeve Collection Berkstresser Collection Sperry Collection Lowrance Collection Spence Collection Photo Downloads Photo Catalogs Library
NEWS
Archives
STORE / CHARTERS
GALLERIES
Gallery Sound Gallery
CALENDAR

Session S (May 8-12)
Sort by
Start Cooliris!
2006 Work Session S_16
  • 2006 Work Session S_16
  • Description:

    Special Session Volunteer work crew.

2006 Work Session S_18
  • 2006 Work Session S_18
  • Description:

    Tim Bristow, Les Calark, John Sutkus and Don Bayer lay rail inside the CRF.

2006 Work Session S_19
  • 2006 Work Session S_19
  • Description:

    Les Clark, John Sutkus and Tim Bristow re-align rail to straighten track while Marty Gonzales drills holes in foundation to secure rebar reinforcement.

2006 Work Session S_20
  • 2006 Work Session S_20
  • Description:

    John Sutkus, Russ Hanscom, Ray Diffee, Don Bayer, Ed Lowrance and Les Clark drive spikes to secure CRF inside track.

2006 Work Session S_21
  • 2006 Work Session S_21
  • Description:

    Don Bayer drives spike as Ed and Russ assist while Les and John observe.

2006 Work Session S_22
  • 2006 Work Session S_22
  • Description:

    Russ Hansom uses his Kubota tractor to ballast track with gravel.

2006 Work Session S_23
  • 2006 Work Session S_23
  • Description:

    Tim, Don and Les cut a piece of rail to size with metal cutting chop saw.

2006 Work Session S_24
  • 2006 Work Session S_24
  • Description:

    Ed, Les, Don, John , Tim and Marty carry rail to lay in place on existing ties.

2006 Work Session S_25
  • 2006 Work Session S_25
  • Description:

    Newlylaid track on the west side of the CRF.

 
Copyright 2010-2016 Friends of the Cumbres & Toltec Scenic Railroad, Inc. | RSS FEED